[Code of Federal Regulations]
[Title 40, Volume 1]
[Revised as of July 1, 2007]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR6.503]
[Page 113-114]
TITLE 40--PROTECTION OF ENVIRONMENT
CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY
PART 6_PROCEDURES FOR IMPLEMENTING THE REQUIREMENTS OF THE COUNCIL ON
ENVIRONMENTAL QUALITY ON THE NATIONAL ENVIRONMENTAL POLICY ACT--
Subpart E_Environmental Review Procedures for Wastewater Treatment
Construction Grants Program
Sec. 6.503 Overview of the environmental review process.
The process for conducting an environmental review of wastewater
treatment construction grant projects includes the following steps:
[[Page 114]]
(a) Consultation. The Step 1 grantee or the potential Step 3 or Step
2+3 applicant is encouraged to consult with the State and EPA early in
project formulation or the facilities planning stage to determine
whether a project is eligible for a categorical exclusion from the
remaining substantive environmental review requirements of this part
(Sec. 6.505), to determine alternatives to the proposed project for
evaluation, to identify potential environmental issues and opportunities
for public recreation and open space, and to determine the potential
need for partitioning the environmental review process and/or the need
for an Environmental Impact Statement (EIS).
(b) Determining categorical exclusion eligibility. At the request of
a potential Step 3 or Step 2+3 grant applicant, or a Step 1 facilities
planning grantee, the responsible official will determine if a project
is eligible for a categorical exclusion in accordance with Sec. 6.505.
A Step 1 facilities planning grantee awarded a Step 1 grant on or before
December 29, 1981 may request a categorical exclusion at any time during
Step 1 facilities planning. A potential Step 3 or Step 2+3 grant
applicant may request a categorical exclusion at any time before the
submission of a Step 3 or Step 2+3 grant application.
(c) Documenting environmental information. If the project is
determined to be ineligible for a categorical exclusion, or if no
request for a categorical exclusion is made, the potential Step 3 or
Step 2+3 applicant or the Step 1 grantee subsequently prepares an
Environmental Information Document (EID) (Sec. 6.506) for the project.
(d) Preparing environmental assessments. Except as provided in Sec.
6.506(c)(4) and following a review of the EID by EPA or by a State with
delegated authority, EPA prepares an environmental assessment (Sec.
6.506), or a State with delegated authority (Sec. 6.514) prepares a
preliminary environmental assessment. EPA reviews and finalizes any
preliminary assessments. EPA subsequently:
(1) Prepares and issues a Finding of No Significant Impact (FNSI)
(Sec. 6.508); or
(2) Prepares and issues a Notice of Intent to prepare an original or
supplemental EIS (Sec. 6.510) and Record of Decision (ROD) (Sec.
6.511).
(e) Monitoring. The construction and post-construction operation and
maintenance of the facilities are monitored (Sec. 6.512) to ensure
implementation of mitigation measures (Sec. 6.511) identified in the
FNSI or ROD.
[50 FR 26317, June 25, 1985, as amended at 51 FR 32611, Sept. 12, 1986]