[Code of Federal Regulations]
[Title 29, Volume 8]
[Revised as of July 1, 2007]
From the U.S. Government Printing Office via GPO Access
[CITE: 29CFR1926.552]
[Page 357-359]
TITLE 29--LABOR
CHAPTER XVII--OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT
OF LABOR
PART 1926_SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION--Table of Contents
Subpart N_Cranes, Derricks, Hoists, Elevators, and Conveyors
Sec. 1926.552 Material hoists, personnel hoists, and elevators.
(a) General requirements. (1) The employer shall comply with the
manufacturer's specifications and limitations applicable to the
operation of all hoists and elevators. Where manufacturer's
specifications are not available, the limitations assigned to the
equipment shall be based on the determinations of a professional
engineer competent in the field.
(2) Rated load capacities, recommended operating speeds, and special
hazard warnings or instructions shall be posted on cars and platforms.
(3) Wire rope shall be removed from service when any of the
following conditions exists:
(i) In hoisting ropes, six randomly distributed broken wires in one
rope lay or three broken wires in one strand in one rope lay;
(ii) Abrasion, scrubbing, flattening, or peening, causing loss of
more than one-third of the original diameter of the outside wires;
(iii) Evidence of any heat damage resulting from a torch or any
damage caused by contact with electrical wires;
(iv) Reduction from nominal diameter of more than three sixty-
fourths inch for diameters up to and including three-fourths inch; one-
sixteenth inch for diameters seven-eights to 1\1/8\ inches; and three
thirty-seconds inch for diameters 1\1/4\ to 1\1/2\ inches.
(4) Hoisting ropes shall be installed in accordance with the wire
rope manufacturers' recommendations.
(5) The installation of live booms on hoists is prohibited.
(6) The use of endless belt-type manlifts on construction shall be
prohibited.
(b) Material hoists. (1)(i) Operating rules shall be established and
posted at the operator's station of the hoist. Such rules shall include
signal system and allowable line speed for various loads. Rules and
notices shall be posted on the car frame or crosshead in a conspicuous
location, including the statement ``No Riders Allowed.''
(ii) No person shall be allowed to ride on material hoists except
for the purposes of inspection and maintenance.
(2) All entrances of the hoistways shall be protected by substantial
gates or bars which shall guard the full width of the landing entrance.
All hoistway entrance bars and gates shall be painted with diagonal
contrasting colors, such as black and yellow stripes.
(i) Bars shall be not less than 2- by 4-inch wooden bars or the
equivalent, located 2 feet from the hoistway line. Bars shall be located
not less than 36 inches nor more than 42 inches above the floor.
(ii) Gates or bars protecting the entrances to hoistways shall be
equipped with a latching device.
(3) Overhead protective covering of 2-inch planking, \3/4\-inch
plywood, or other solid material of equivalent strength, shall be
provided on the top of every material hoist cage or platform.
(4) The operator's station of a hoisting machine shall be provided
with overhead protection equivalent to tight planking not less than 2
inches thick. The support for the overhead protection shall be of equal
strength.
(5) Hoist towers may be used with or without an enclosure on all
sides. However, whichever alternative is chosen, the following
applicable conditions shall be met:
(i) When a hoist tower is enclosed, it shall be enclosed on all
sides for its entire height with a screen enclosure of
[[Page 358]]
\1/2\-inch mesh, No. 18 U.S. gauge wire or equivalent, except for
landing access.
(ii) When a hoist tower is not enclosed, the hoist platform or car
shall be totally enclosed (caged) on all sides for the full height
between the floor and the overhead protective covering with \1/2\-inch
mesh of No. 14 U.S. gauge wire or equivalent. The hoist platform
enclosure shall include the required gates for loading and unloading. A
6-foot high enclosure shall be provided on the unused sides of the hoist
tower at ground level.
(6) Car arresting devices shall be installed to function in case of
rope failure.
(7) All material hoist towers shall be designed by a licensed
professional engineer.
(8) All material hoists shall conform to the requirements of ANSI
A10.5-1969, Safety Requirements for Material Hoists.
(c) Personnel hoists. (1) Hoist towers outside the structure shall
be enclosed for the full height on the side or sides used for entrance
and exit to the structure. At the lowest landing, the enclosure on the
sides not used for exit or entrance to the structure shall be enclosed
to a height of at least 10 feet. Other sides of the tower adjacent to
floors or scaffold platforms shall be enclosed to a height of 10 feet
above the level of such floors or scaffolds.
(2) Towers inside of structures shall be enclosed on all four sides
throughout the full height.
(3) Towers shall be anchored to the structure at intervals not
exceeding 25 feet. In addition to tie-ins, a series of guys shall be
installed. Where tie-ins are not practical the tower shall be anchored
by means of guys made of wire rope at least one-half inch in diameter,
securely fastened to anchorage to ensure stability.
(4) Hoistway doors or gates shall be not less than 6 feet 6 inches
high and shall be provided with mechanical locks which cannot be
operated from the landing side, and shall be accessible only to persons
on the car.
(5) Cars shall be permanently enclosed on all sides and the top,
except sides used for entrance and exit which have car gates or doors.
(6) A door or gate shall be provided at each entrance to the car
which shall protect the full width and height of the car entrance
opening.
(7) Overhead protective covering of 2-inch planking, \3/4\-inch
plywood or other solid material or equivalent strength shall be provided
on the top of every personnel hoist.
(8) Doors or gates shall be provided with electric contacts which do
not allow movement of the hoist when door or gate is open.
(9) Safeties shall be capable of stopping and holding the car and
rated load when traveling at governor tripping speed.
(10) Cars shall be provided with a capacity and data plate secured
in a conspicuous place on the car or crosshead.
(11) Internal combustion engines shall not be permitted for direct
drive.
(12) Normal and final terminal stopping devices shall be provided.
(13) An emergency stop switch shall be provided in the car and
marked ``Stop.''
(14) Ropes: (i) The minimum number of hoisting ropes used shall be
three for traction hoists and two for drum-type hoists.
(ii) The minimum diameter of hoisting and counterweight wire ropes
shall be \1/2\-inch.
(iii) Safety factors:
Minimum Factors of Safety for Suspension Wire Ropes
------------------------------------------------------------------------
Minimum
Rope speed in feet per minute factor of
safety
------------------------------------------------------------------------
50.......................................................... 7.60
75.......................................................... 7.75
100......................................................... 7.95
125......................................................... 8.10
150......................................................... 8.25
175......................................................... 8.40
200......................................................... 8.60
225......................................................... 8.75
250......................................................... 8.90
300......................................................... 9.20
350......................................................... 9.50
400......................................................... 9.75
450......................................................... 10.00
500......................................................... 10.25
550......................................................... 10.45
600......................................................... 10.70
------------------------------------------------------------------------
(15) Following assembly and erection of hoists, and before being put
in service, an inspection and test of all functions and safety devices
shall be made under the supervision of a competent
[[Page 359]]
person. A similar inspection and test is required following major
alteration of an existing installation. All hoists shall be inspected
and tested at not more than 3-month intervals. The employer shall
prepare a certification record which includes the date the inspection
and test of all functions and safety devices was performed; the
signature of the person who performed the inspection and test; and a
serial number, or other identifier, for the hoist that was inspected and
tested. The most recent certification record shall be maintained on
file.
(16) All personnel hoists used by employees shall be constructed of
materials and components which meet the specifications for materials,
construction, safety devices, assembly, and structural integrity as
stated in the American National Standard A10.4-1963, Safety Requirements
for Workmen's Hoists. The requirements of this paragraph (c)(16) do not
apply to cantilever type personnel hoists.
(17) (i) Personnel hoists used in bridge tower construction shall be
approved by a registered professional engineer and erected under the
supervision of a qualified engineer competent in this field.
(ii) When a hoist tower is not enclosed, the hoist platform or car
shall be totally enclosed (caged) on all sides for the full height
between the floor and the overhead protective covering with \3/4\-inch
mesh of No. 14 U.S. gauge wire or equivalent. The hoist platform
enclosure shall include the required gates for loading and unloading.
(iii) These hoists shall be inspected and maintained on a weekly
basis. Whenever the hoisting equipment is exposed to winds exceeding 35
miles per hour it shall be inspected and put in operable condition
before reuse.
(iv) Wire rope shall be taken out of service when any of the
following conditions exist:
(a) In running ropes, six randomly distributed broken wires in one
lay or three broken wires in one strand in one lay;
(b) Wear of one-third the original diameter of outside individual
wires. Kinking, crushing, bird caging, or any other damage resulting in
distortion of the rope structure;
(c) Evidence of any heat damage from any cause;
(d) Reductions from nominal diameter of more than three-sixty-
fourths inch for diameters to and including three-fourths inch, one-
sixteenth inch for diameters seven-eights inch to 1\1/8\ inches
inclusive, three-thirty-seconds inch for diameters 1\1/4\ to 1\1/2\
inches inclusive;
(e) In standing ropes, more than two broken wires in one lay in
sections beyond end connections or more than one broken wire at an end
connection.
(d) Permanent elevators under the care and custody of the employer
and used by employees for work covered by this Act shall comply with the
requirements of American National Standards Institute A17.1-1965 with
addenda A17.1a-1967, A17.1b-1968, A17.1c-1969, A17.1d-1970, and
inspected in accordance with A17.2-1960 with addenda A17.2a-1965,
A17.2b-1967.
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, 1979, as amended at 52
FR 36382, Sept. 28, 1987]